8226此ID下载地址不存在1--/PDFManualEN/Mitsubishi-A985GOT-TBA-EU_A975GOT-TBA-EU_A970GOT-TBA-EU_A970GOT-SBA-EU_A970GOT-LBA-EU_A960GOT-EBA-EU-users-(Hardware).pdf A970GOT-LBD User's Manual MITSUBISHI A970GOT-LBD Hardware Manual - LK
LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> A970GOT-LBD User's Manual MITSUBISHI A970GOT-LBD Hardware Manual

A970GOT-LBD User's Manual MITSUBISHI A970GOT-LBD Hardware Manual

Product model: A970GOT-LBD
Name: Graphic Operation Terminal
Brand: MITSUBISHI
Sort: Hardware User's Manual
File language: English
File size: 0.00MB
8 channels.
Input: DC-10 ~ 10V, DC4 ~ 20mA.
Output (resolution): -2000 ~ 2000.
Transform speed: 2.5ms/1 channel.
47 point terminal station.
Each channel D can be set A/ transform the.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register MITSUBISHI A970GOT-LBD Manual.
And then combine the data and the program with CPU A970GOT-LBD
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI A970GOT-LBD Manual.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light MITSUBISHI A970GOT-LBD Manual.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process. TFT color LCD touch screen to replace the backlight.
Applicable model: A985GOT-V. Input points: 16 points.
Voltage: AC200 ~ 240V.
Current: 10mA.
Response time: 25ms.
16 points / a common end..
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component iimage register are changed with the change of the execution of the program A970GOT-LBD User's Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A970GOT-LBD User's Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
Related products
MITSUBISHI
6 inch man machine interface
A950GOT-LBD
MITSUBISHI 6 inch man machine interface A950GOT-LBD
Series Name: A950GOT. Size: 6 inches. Resolut
MITSUBISHI
10 inch man machine interface
A970GOT-SBD
MITSUBISHI 10 inch man machine interface A970GOT-SBD
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
6 inch man machine interface
A953GOT-LBD
MITSUBISHI 6 inch man machine interface A953GOT-LBD
Series Name: A953GOT. Size: 6 inches. Resolut
MITSUBISHI
10 inch man machine interface
A970GOT-TBD-B
MITSUBISHI 10 inch man machine interface A970GOT-TBD-B
Series Name: A975GOT. Size: 10 inches. Resolu