LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A2ACPUP21-S1 User's Manual

MITSUBISHI A2ACPUP21-S1 User's Manual

Product model: A2ACPUP21-S1
Name: PLC
Brand: MITSUBISHI
Sort: User's Manual
File language: English
File size: 5.43MB
3C-2V/5C-2V coaxial cable.
Double circuit.
MELSECNET (II) (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A2ACPUP21-S1 A2ACPUP21-S1
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A2ACPUP21-S1 . . Cable length: 10.6 meters.
Small CPU long distance connecting cable.
For QnAS/AnSCPU/ motion control and GOT connection.
For connection between A7GT-CNB and GOT.
Combination A8GT-EXCNB and A8GT-C_BS. Input type: DC input, positive common end.
Input points: 16 points A2ACPUP21-S1 .
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Spring clip terminal.
Do not need to be tightened further or locked with screws, which can reduce the working hours of wiring.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.
When installing the module can choose to use the DIN guide rail or screw mounting.
Can be used for the 3 wire sensor input wiring. 8 slots.
To install the power supply.
For Q4AR power duplex.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
Therre exist input / output hysteresis phenomena, i A2ACPUP21-S1 User's Manual. e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A2ACPUP21-S1 User's Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products
MITSUBISHI
CPU unit
A2ACPUP21-S1
MITSUBISHI CPU unit A2ACPUP21-S1
Input and output points: 1024 points. Input /
MITSUBISHI
CPU unit
A2ACPUP21-S3
MITSUBISHI CPU unit A2ACPUP21-S3
Input and output points: 512 points. Input /
MITSUBISHI
CPU unit
A2ACPUP21-S4
MITSUBISHI CPU unit A2ACPUP21-S4
Input and output points: 1024 points. Input /