Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/6mA.
External connection: 3 wire.
Spring clamping terminal platform push type input module.
Input module with diagnostic function
The use of push type, do not need screw fastening, so can reduce the wiring hours MITSUBISHI A956GOT-TBD Manual.
Can be used for each 1 points to enter the wiring of the broken wire detection
A956GOT-TBD
Wiring abnormality of external power supply can be confirmed.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module. RS-232 1 channels.
With DC input 2 points.
Transistor output 2 MITSUBISHI A956GOT-TBD Manual.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI A956GOT-TBD Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. MELSECNET/10.
Inter-PC coaxial bus. Master / local station.
QnACPU use.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A956GOT-TBD Operating Manual.
The main contents of the initialization program aree: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A956GOT-TBD Operating Manual. . "