LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> A970GOT-LBA-EU Operating Manual MITSUBISHI A970GOT-LBA-EU SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual

A970GOT-LBA-EU Operating Manual MITSUBISHI A970GOT-LBA-EU SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Manual

Product model: A970GOT-LBA-EU
Name: touch screen
Brand: MITSUBISHI
Sort: SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual Operating Manual
File language: English
File size: 3.00MB
For common cathode input module (2 line type).Cable length: 30 meters.
PC to GOT long distance connection cable.
For connection between GOT and GOT. 5 slots.
Can be installed in the power supply unit for AnS series units installed QnAS/.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment MITSUBISHI A970GOT-LBA-EU Manual A970GOT-LBA-EU
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students MITSUBISHI A970GOT-LBA-EU Manual.
PLC user program is designed according to the control system of the process control requirements,
PLC programming language through the preparation of specifications, in accordance with the actual needs of the use of the function to design.
As long as the user can master some kind of standard programming language,
To be able to use PLC in the control system,
To achieve a variety of automatic control functions MITSUBISHI A970GOT-LBA-EU Manual. DC input points: 16 points.
Input voltage and current: 5mA, DC24V.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
Output points: 16 points.
Output voltage and current: DC24V, 0.1A/1 point, 1.6A/1 common end.
Response time: 2ms.
16 point /1 a public side.
Output form: transistor output, leakage type.
40 pin connector.
Number of stations: 4 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timelinesss is strong A970GOT-LBA-EU Operating Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A970GOT-LBA-EU Operating Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
Related products