8 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order Q03UDVCPU Manual.
So, sometimes also known as the order control
Q03UDVCPU
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read Q03UDVCPU Manual.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three Q03UDVCPU Manual.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation MITSUBISHI Q03UDVCPU Programming Manual MITSUBISHI Q03UDVCPU Programming Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.FL-net (OPCN-2) Ver.1.00 interface.
10BASE5/10BASE-T use.
Optimal network matching for application purposes and applications,
Seamless communication between different hierarchical systems MITSUBISHI Q03UDVCPU Programming Manual.
Enhancing the ability of information communication through network.
This is also a major task in the field of automation.
Network environment provided by Q series
Is truly open & seamless.
Including based on universal ethernet,
Achieve easy management of the environment "IE Control CC-Link" controller network,
As well as in its management to achieve a high-speed, high-capacity transmission of the "IE Field CC-Link" field network.
Also including Japan''s first, to achieve the world standard,
And get the SEMI certification of the field network "CC-Link",
And inherited the design concept of the provincial distribution network CC-Link/LT".
And support sensor networks "AnyWire",
To enrich the lineup flexibility to integrate the various layers of automation network.
Easy connection programming tool via ethernet.
Programming tools (Works2 GX, Developer GX) and CPU direct connection (1 to 1),
No need to carry out the IP address settings. And there is no need to select the cable, the straight line and the cross line can be used.
Therefore, this connection method and the use of USB, can easily communicate with the CPU,
Even the operators are not familiar with the network settings can easily establish a connection.
Real time transmission control data, to improve the production efficiency and the value of the equipment to provide support for the high-speed data communication module.
The high accuracy data that can be synchronized with the sequential scanning to the user program on the PC can be transmitted through the Ethernet Q03UDVCPU Structured Text.
Realize the previous communication method can not achieve the detailed control of ddata transmission,
Real time data analysis using user applications,
In order to provide support for improving production efficiency and equipment value Q03UDVCPU Manual.