LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A6PHP(SW1GP-GPPK) Manual A6PHP(SW1GP-GPPK) Operating Manual

MITSUBISHI A6PHP(SW1GP-GPPK) Manual A6PHP(SW1GP-GPPK) Operating Manual

Product model: A6PHP(SW1GP-GPPK)
Name: PLC
Brand: MITSUBISHI
Sort: Operating Manual
File language: English
File size: 8.00MB
Applicable model: A985GOT (-V).AnS, QnAS bus connection, the reader to write program 2 channel connection.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU A6PHP(SW1GP-GPPK) Operating Manual.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive A6PHP(SW1GP-GPPK)
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A6PHP(SW1GP-GPPK) Operating Manual.
This phenomenon is called the I/O delay time effect. I/O control method: refresh mode or direct mode.
User program storage capacity: 14K step.
I/O points: 512 points.
Memory capacity: bytes 64K.
ANSCPU has been updated to ANSHCPU, and it has the following advantages A6PHP(SW1GP-GPPK) Operating Manual.
16 bit dedicated microprocessor.
Large capacity battery backup memory RAM.
Extended I/O control capability.
Dedicated CC-Link instruction.
Capacity for extended comment storage.
PLC programming is a digital computing operation of the electronic system,
Designed for applications in industrial environments.
It uses programmable memory,
An instruction used to perform logical operations, sequence control, timing, counting and arithmetic operations in its internal storage,
And through the digital, analog input and output, control of various types of machinery or production process.
Programmable controller and related equipment,
Should be easy to make the industrial control system to form a whole, easy to expand the principle design of its functions. Enter 16 points: 24VDC.
Response time 1.5ms.
Waterproof type.
4 wire type.
Waterproof connector type.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line uniification to adjust A6PHP(SW1GP-GPPK) Manual .
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A6PHP(SW1GP-GPPK) Manual .
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.