Output points: 8 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered A985GOT-TBA-G Operating Manual.
It can avoid the control logic confusion caused by illegal operations
A985GOT-TBA-G
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A985GOT-TBA-G Operating Manual. .
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation A985GOT-TBA-G Operating Manual. Extension cable.
Length: 1000mm. Series Name: A985GOT.
Size: 12 inches.
Resolution: 800 * 600.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: AC100-240V.
Authentication: UL/cUL/CE.
Man machine interface (Machine Interaction Human, referred to as HMI), also known as the user interface or user interface,
Is a communication interface between human and computer,
Is an important part of the computer system.
Is a medium for interaction and information exchange between the system and the user,
It realizes the transformation between the internal form of information and the acceptable form of human being.
Where there is a man-machine interface in the field of human computer information exchange. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 2~4 line type.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and thhe timeliness is strong A985GOT-TBA-G Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A985GOT-TBA-G Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.