LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI AY11EEU Manual AY11EEU User's Manual

MITSUBISHI AY11EEU Manual AY11EEU User's Manual

Product model: AY11EEU
Name: I/O Module
Brand: MITSUBISHI
Sort: User's Manual
File language: English
File size: 3.29MB
SI/QSI/H-PCF/ wide H-PCF optical cable double loop PC (control station / common station) / remote I/O network (remote master station). With external power supply function.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AY11EEU User's Manual AY11EEU
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of AY11EEU User's Manual.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on AY11EEU User's Manual.
This phenomenon is called the I/O delay time effect. Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay output.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC prograam simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AY11EEU Manual AY11EEU Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
Relay output module
AY10A
MITSUBISHI Relay output module AY10A
Output points: 16 points. Voltage: DC24V/AC24
MITSUBISHI
Relay output module
AY11A
MITSUBISHI Relay output module AY11A
Output points: 16 points. Voltage: DC24V/AC24
MITSUBISHI
Relay output module
AY11EEU
MITSUBISHI Relay output module AY11EEU
Output points: 16 points. Voltage: DC24V/AC24
MITSUBISHI
Relay output module
AY15EU
MITSUBISHI Relay output module AY15EU
Output points: 24 points. Voltage: DC24V/AC24