Capable of continuous thermocouple or platinum temperature measurement.
In addition, the temperature measurement range can be set with the use of the temperature.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of A970GOT-SBA-EU Manual
A970GOT-SBA-EU
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A970GOT-SBA-EU Manual.
This phenomenon is called the I/O delay time effect. Input type: DC input, positive public end / negative public end.
Input points: 16 points A970GOT-SBA-EU Manual.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 2 wire.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module MITSUBISHI A970GOT-SBA-EU Operating Manual. 3C-2V/5C-2V coaxial cable.
Single bus.
PC inter network (management station / common station) / remote I/O network (remote control station) MITSUBISHI A970GOT-SBA-EU Operating Manual.
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps MITSUBISHI A970GOT-SBA-EU Operating Manual.
Design PLC perippheral hardware circuit A970GOT-SBA-EU Introductory Manual.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system compoosed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram A970GOT-SBA-EU Manual.
So far the system''s hardware electrical circuit has been determined.