LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> touch screen A975GOT-TBD-CH Introductory Manual Operating Manual MITSUBISHI A975GOT-TBD-CH Manual

touch screen A975GOT-TBD-CH Introductory Manual Operating Manual MITSUBISHI A975GOT-TBD-CH Manual

Product model: A975GOT-TBD-CH
Name: touch screen
Brand: MITSUBISHI
Sort: Introductory Manual Operating Manual
File language: English
File size: 0.85MB
Output type: transistor output, drain type.
Output points: 8 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.5A.
External connection: 2 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup A975GOT-TBD-CH Operating Manual.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool A975GOT-TBD-CH I/O slots: 8 slots.
Can you install the power module.
Outline dimension: 365*130.
There are two types of extended floor,
A power module can be inserted, and the other one is not A975GOT-TBD-CH Operating Manual.
The choice of any type of substrate depends on the total DC5V current consumption and the power supply on the CPU main substrate.
If the total demand is less than the power output, no additional power supply,
Then you can choose a more economical expansion board.
Both ends of the main base plate of the CPU have an expansion interface, and can be used for extending the cable connection A975GOT-TBD-CH Operating Manual. Input points: 32 points.
Input voltage: DC12V/DC24V.
Current: 3/7mA.
Response time: 10ms.
16 points / a common end.
Positive pole sharing.
50 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation MITSUBISHI A975GOT-TBD-CH Manual MITSUBISHI A975GOT-TBD-CH Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference MITSUBISHI A975GOT-TBD-CH Manual. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image rregister are changed with the change of the execution of the program A975GOT-TBD-CH Introductory Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A975GOT-TBD-CH Operating Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.