DC input points: 2 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
2 point /1 a public side.
Positive / negative sharing.
Output points: 2 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 4A/1 common end.
Output response time: 2ms.
2 point /1 a public side.
Output form: relay MITSUBISHI A2CCPUR21 PDF datasheet.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures
A2CCPUR21
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI A2CCPUR21 PDF datasheet.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI A2CCPUR21 PDF datasheet.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. QnA/ACPU bus connection.
1 joint.
Applicable model: A956WGOT. Optional features of memory card (Q/QnA/A/FX compatible).
4MB extended memory.
Applicable models: A985 (-V) /975/970/A960GOT (-B) /A956WGOT. Input points: 16 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
8 points / a common end.
Cathode common.
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the componeent image register are changed with the change of the execution of the program A2CCPUR21 PDF catalog.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A2CCPUR21 PDF catalog.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.