3C-2V/5C-2V coaxial cable.
Double loop.
Remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the innput / output device connection diagram or the corresponding table,
This part also can be carried out in second steps AJ65SBTC4-16DN.
Design PLC peripheral hardware circuit AJ65SBTC4-16DN.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram AJ65SBTC4-16DN.
So far the system''s hardware electrical circuit has been determined. SI/QSI/H-PCF/ wide H-PCF optical cable double loop PC (control station / common station) / remote I/O network (remote master station).
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order MITSUBISHI AJ65SBTC4-16DN.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic MITSUBISHI AJ65SBTC4-16DN.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of MITSUBISHI AJ65SBTC4-16DN.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 4 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual statee of the scene,
Create the necessary environmental conditions for the operation of the program AJ65SBTC4-16DN.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.