LK Automation Limited
Home >> Supply >> AJ71BR11 MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit MITSUBISHI AJ71BR11
Search
Information sort

AJ71BR11 MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit MITSUBISHI AJ71BR11


QnA/ACPU bus connection.
1 joint.
Applicable models: A985 (-V) /975/970/960/956 (W) GOT. Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire AJ71BR11.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting AJ71BR11.
3 wire sensor input.
3C-2V/5C-2V coaxial cable.
Single bus.
PC inter network (management station / station) / remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc AJ71BR11..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps MITSUBISHI AJ71BR11.
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram MITSUBISHI AJ71BR11.
So far the system''s hardware electrical circuit has been determined. Output points: 24 points.
Voltage: DC24V/AC240V, 2A/1 point, 4A/ public end.
OFF leakage current: 0mA.
Output type: relay output.
Response time: 12ms.
8 points / a common end MITSUBISHI AJ71BR11.
50 point terminal station.
CE certification.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
System program memory for storing system proggram,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation AJ71BR11.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.

Related supply information