LK Automation Limited
Home >> Supply >> AY13 Relay output module MITSUBISHI AY13
Search
Information sort

AY13 Relay output module MITSUBISHI AY13


8 channels.
3 wire platinum measuring antibodies (Pt100, JPt100).
Transform speed: 40ms/1 channel.
38 point terminal station.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference AY13. Therefore PLC selection,
Under the premise of meeting the control requiirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light AY13.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal AY13.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process MITSUBISHI AY13.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register MITSUBISHI AY13.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI AY13. Special multi axis positioning controller for NSD servo system.
Program capacity: Max 60K step.
Input / output points: 1920 points.
Control AC motor required I/O points with PLC control AC motor,
Signal and feedback signal is used as the input signal of PLC,
The control of AC motor is accomplished by using the output signal of PLC to drive the contactor.
For example, the AC motor is controlled by a Y- delta starting with PLC,
Generally need to occupy 4 of the PLC input and 3 output points,
PLC control of a one-way operation of the cage type motor,
4 input points and 1 output points are occupied, and a reversible motor is controlled,
5 input points and 2 output points are needed to control a unidirectional operation of variable pole speed control motor,
5 input points and 2 output points are required to control a unidirectional operation of the rotor AC motor,
3 input points and 4 output points are needed to control a reversible running winding rotor AC motor,
Requires 4 input points and 5 output points.
Output points: 32 points.
Voltage: DC24V/AC240V, 2A/1 point, 5A/1 public end.
Output type: relay output.
Response time: 12ms.
8 point /1 a public side.
38 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A buttonn needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points AY13.

Related supply information