LK Automation Limited
Home >> Supply >> MITSUBISHI A953GOT-SBD-M3-H Touch screen
Search
Information sort

MITSUBISHI A953GOT-SBD-M3-H Touch screen


Enter 32 points.
2/5mA DC12/24V.
Response time: 10ms.
32 point 1 public.
Output 32 points.
DC12/24V.
Leakage current: 0.1mA OFF.
Response time: 1ms.
32 point 1 public.
Protection function.
Surge.
40 pin connector.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF A9533GOT-SBD-M3-H.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A953GOT-SBD-M3-H MITSUBISHI A953GOT-SBD-M3-H.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic A953GOT-SBD-M3-H.
And the control principle is decentralized, centralized and hybrid control three. Input points: 16 points.
Input voltage and current: 240V ~ 10mA AC100 MITSUBISHI A953GOT-SBD-M3-H.
Input response time: 35ms.
16 point /1 a public side.
Output points: 12 points.
Output voltage: AC100 ~ 240V.
OFF leakage current: 3mA.
Output response time: 0.5Hz+1ms.
Output type: bidirectional thyristor output.
8 point /1 a public end, 4 points / a public end MITSUBISHI A953GOT-SBD-M3-H.
36 point terminal station.
With short circuit protection.
With the surge absorber.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowwing reverse switching signal and brake open signal etc A953GOT-SBD-M3-H..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.

Related supply information