Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector MITSUBISHI FR-BU2-H55K.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input
FR-BU2-H55K Input points: 32 points.
Voltage: DC24V.
Current: 7mA (external switch ON) /1.5mA (external switch OFF).
Response time: 10ms.
32 points / a common end.
Positive / negative sharing.
38 point terminal station MITSUBISHI FR-BU2-H55K.
Disconnection detection function.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation .
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive MITSUBISHI FR-BU2-H55K.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The coontents of the ccomponent image register are changed with the change of the execution of the program FR-BU2-H55K.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling FR-BU2-H55K.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
FR-BU2-H55K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-BU2-H55K&select=5