Master / local station sharing.
IE CC-Link field network.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps MITSUBISHI .
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update
GT11H-C130-32P Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX MITSUBISHI .
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation .
QJ71GF11-T2 can be used as the main station / local station of IE CC-Link field network.Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0 MITSUBISHI . 25mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 1 wire .
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. ROM capacity: 16K bytes (max 7K step).
A2A, A2A-S1, A3A, A2N, A2N-S1, A3N storage box. Input and output points: 512 points.
Input / output data points: 512 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Optical data communication line function (GI cable).
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure of howw much the user application can store the number of indicators MITSUBISHI GT11H-C130-32P.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words MITSUBISHI GT11H-C130-32P. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
GT11H-C130-32P Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT11H-C130-32P&select=5