ME-NET interface unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI .
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system
HA-LF15K1
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc MITSUBISHI . . Length: 0.5 meters.
Purpose: MR-JE-A, MR-TB50 connection with. MITSUBISHI inverter FR-A740 series.
Voltage level: 3 phase 400V.
Frequency converter capacity: 75KW.
Frequency converter is the application of frequency conversion technology and micro electronics technology, by changing the motor operating power frequency mode to control the AC motor power control equipment MITSUBISHI .
The converter is composed of rectifier (AC), filter, inverter (DC), braking unit, driving unit, micro processing unit of the detection unit.
Inverter by the internal IGBT to adjust the output power supply voltage and frequency,
According to the actual needs of the motor to provide the required power supply voltage, and then achieve the purpose of energy saving, speed control, in addition to the,
Inverter has a lot of protection functions, such as over current, over voltage, overload protection and so on. For A6TBXE/A6TBY36E/A6TBX54E/A6TBY54E/A6TBX70E (common cathode; source) long 2m.Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure oof how much the user application can store the number of indicators MITSUBISHI HA-LF15K1.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words MITSUBISHI HA-LF15K1. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
HA-LF15K1 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HA-LF15K1&select=5