Enter 16 points.
Voltage and current: 14mA DC24V.
Response time: 8ms.
16 point 1 public end, 20 point terminal.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book
GT10-30PCO
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points MITSUBISHI GT10-30PCO. Adapter for mounting rails. Unit connection CPU unit.Drive unit.
MITSUBISHI universal AC servo amplifier MELSERVO-J4 series.
Rated output: 55kw.
Interface: SSCNET III /H.
Power supply: three phase AC400V.
Support position control, speed control, torque control.
Position control to follow the position instructions MITSUBISHI GT10-30PCO.
When the control is inserted, the position control is performed .
Speed control follows the speed command to control the speed within a certain range.
Torque control to follow the torque command to control the stable torque.
Function of switching amplitude. The increase in the process of switching and stopping,
And in the operation of the use of the switching signal, switching growth. MITSUBISHI general purpose AC servo amplifier MR-J2 series.
Rated output: 0.75kw.
Interface: single axis positioning built-in type.
Voltage: single phase AC200V.
High response.
High precision positioning.
High level automatic tuning, can easily achieve gain settings.
Adopting adaptive vibration control and reducing vibration.
With a computer combination, using the software to achieve the best tuning.
Pulse sequence input (position, speed control), analog input (speed, torque control) two purposes.
Simple operation.
The socket is arranged on the front panel, and is convenient to connect.
Using the socket, wiring easy.
Setting method and J2Super with interchangeable. Output points: 8 points.
Output voltage and current: DC12/24V, 2A/1 point, 6A/1 common end.
Response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
26 point terminal station.
Number of stations: 1 stops.
Type remote I/O units outside of the panel (optical data connection).
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA deevices .
The Etthernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system GT10-30PCO.
At the same time, tthee use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information GT10-30PCO.
GT10-30PCO Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT10-30PCO&select=5