LK Automation Limited
Home >> Price >> MITSUBISHI >> Sale F9GT-HCAB1-10M MITSUBISHI F9GT-HCAB1-10M
Brand sort

Sale F9GT-HCAB1-10M MITSUBISHI F9GT-HCAB1-10M

Country: JAPAN
Name: Cable for connecting hand held GOT and PLC
Price: 0
MITSUBISHI F9GT-HCAB1-10M
Thermocouple input.
Number of input channels: 4ch.
Standard control.
Heating and cooling control.
Self tuning function.
Peak current suppression.
Heating function at the same time.
Sampling period switching function.
Temperature input mode.
Temperature regulation mode.
To achieve high stability temperature control
Standard control / heating, cooling control F9GT-HCAB1-10M.
The device used for the temperature control of the temperature control of the extrusion molding machine can prevent over heating and cooling F9GT-HCAB1-10M
According to the object device can choose any one of the following control method.
Standard control (heating or cooling) F9GT-HCAB1-10M.
Heating, cooling control (heating and cooling).
Hybrid control (combination of standard control and heating, cooling control) .
To reduce operating costs by saving energy
Peak current suppression
After the peak current suppression function is used, the number of the upper limit output limit of each channel can be changed automatically,
Split transistor output time. To suppress the peak current F9GT-HCAB1-10M.
Restrain the peak current to achieve energy saving effect (reducing the power supply capacity of the equipment, saving the electricity contract), and reduce the operation cost .
Achieve average temperature control
Warming function at the same time
By making the arrival time of the multi loop consistent, uniform temperature control function.
It can control temperature uniform, to ensure that the control object no local burning or thermal expansion.
No idle running, with energy saving effect, can reduce operating costs. Temperature sensor: PT100, 3 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output siignal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse oof the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI F9GT-HCAB1-10M MITSUBISHI F9GT-HCAB1-10M.
This phenomenon is called the I/O delay time effect.
F9GT-HCAB1-10M Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=F9GT-HCAB1-10M&select=5


...more relevant model market price >>>>
Related download