Set high performance CNC and high speed programmable controller as a whole.
Integrating the high performance CNC with the high speed programmable controller helps to shorten the overall cycle time.
Support a rich variety of FA modules, can be flexible to meet the needs of different applications.Purpose: to operate, monitor, and change the parameters through the network MITSUBISHI .
Applicable frequency converter: FR-A700, FR-F700, FR-E700
Q3MEM-BAT Servo motor series: medium inertia, small capacity.
Rated output: 2.0kw.
Rated speed: 2000r/min.
Electromagnetic brake: No.
Oil seal: incidental (Note 1, note 2, note 3).
Power supply: 200V.
Note 1 through HG-KR and HG-MR series 0 MITSUBISHI . 1kW and HG-SR series can be supported .
Note 2 with the speed reducer case, do not configure the oil seal.
Note 3 with oil seal HG-KR, HG-MR series servo motor''s appearance size standard is different.
Stable driving of medium capacity and medium inertia type products.
Through the optimization of structural design, to achieve the minimum length of the industry MITSUBISHI .
High speed & high torque. Shorten the positioning time, achieve high-speed equipment .
Reducing the electric torque ripple.
Through the combination of the optimal number of the motor and the slot number, the torque ripple is greatly reduced,
To further realize the smooth constant speed device.
Improve the environmental performance of HG-SR, HG-JR series of products using IP67. Input and output points: 512 points.
Input / output data points: 512 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure oof how much the user application can store the number of indicators MITSUBISHI Q3MEM-BAT.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words MITSUBISHI Q3MEM-BAT. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
Q3MEM-BAT Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=Q3MEM-BAT&select=5