Drive unit.
MITSUBISHI universal AC servo amplifier MELSERVO-J4 series.
Rated output: 30kw.
Interface: SSCNET III /H.
Power supply: three phase AC400V.
Special specifications: full closed control 4 wire / support mechanical end encoder ABZ phase input / support positioning mode.
Support position control, speed control, torque control A0J2-C214-S1 Price.
Position control to follow the position instructions.
When the control is inserted, the position control is performed
A0J2-C214-S1
Speed control follows the speed command to control the speed within a certain range.
Torque control to follow the torque command to control the stable torque.
Function of switching amplitude A0J2-C214-S1 Price. The increase in the process of switching and stopping,
And in the operation of the use of the switching signal, switching growth . Input points: 32 points.
Input voltage: DC12V/DC24V.
Current: 3/7mA.
Response time: 10ms.
16 points / a common end.
Positive pole sharing.
50 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation A0J2-C214-S1 Price.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The coontents of the component imaage register are changed with the change of the execution of the program MITSUBISHI A0J2-C214-S1.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling MITSUBISHI A0J2-C214-S1.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
A0J2-C214-S1 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A0J2-C214-S1&select=5