MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 0.6kw.
Interface type: SSCNET type III fiber communication.
Special specification: suitable for linear servo motor.
Power specification: three phase AC400V.
More advanced real-time automatic tuning by setting response values,
Including the position gain and the gain of speed, all the gain can be adjusted automatically
A9GT-J71E71-T
32 segment response level can be set.
Advanced vibration suppression control.
An optimal vibration control filter value is automatically set by the automatic tuning function to effectively suppress the vibration of the 100Hz frequency that occurs when the driving part stops MITSUBISHI A9GT-J71E71-T.
The automatic tuning function can effectively restrain the vibration of the end of the mechanical arm and reduce the residual vibration in the machine . Specification: allowed regeneration power: 100W, resistance value: 40 ohm.
Purpose: MR-JE-100B and MR-JE-100A for the following purposes. DC input points: 32 points.
Input voltage and current: 3/7mA, DC12/24V MITSUBISHI A9GT-J71E71-T.
Response time: 10ms.
Positive pole sharing.
Output points: 16 points .
Output voltage and current: 100mA/1, DC12/24V point.
Response time: 2ms.
48 point /1 public side (input and output sharing).
Output form: transistor output, leakage type.
40 pin connector.
Number of stations: 1 stops.
Type remote I/O unit (twisted pair data connection).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, andd the timeliness is strong A9GT-J71E71-T.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness A9GT-J71E71-T.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
A9GT-J71E71-T Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A9GT-J71E71-T&select=5