Cable length: 10m.
For QnA/ACPU/ motion controller CPU (A Series) /FXCPU. Connection between (D-SUB25 pin connector) and GOT.
For the connection between FA-CNV*CBL and GOT.
Connector for serial communication unit and GOT.
For the connection between AJ65BT-G4-S3 and GOT.
Applicable models: GT16, GT15, GT11, HandyGOT, GT10, GT27, GT25, GT23,, GT21 MITSUBISHI FR-BAL-H45K. Program memory capacity: 8k.
Input / output points: maximum 256 points
FR-BAL-H45K
A scan cycle of PLC must pass through three stages: input sampling, program execution and output refresh.
PLC in the input sampling phase: first of all, in order to scan the sequence of all existing input latches in the input terminal of the state or input data read,
And write it into the corresponding input status register,
Refresh the input, then close the input port, enter the program execution stage MITSUBISHI FR-BAL-H45K. Motor series: medium inertia, medium power.
Rated output power: 3.5kw.
Rated speed: 1000r/min.
Whether to bring the brakes: with.
Shaft end: Standard (straight).
Protection level: IP65 (IP67) MITSUBISHI FR-BAL-H45K.
Features: medium inertia from low speed to high speed three modes for selection, suitable for different applications .
Application examples: transmission machinery, robots, X-Y working platform.
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring. Screw, 2 piece type terminal
Platinum temperature measuring resistor body PT100 temperature input module.
Number of channels: 4 channels.
Number of stations: 4 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the ellectrical wiring diagram and wiring diagram FR-BAL-H45K.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesiign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced FR-BAL-H45K.
FR-BAL-H45K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-BAL-H45K&select=5