Type: general purpose AC servo amplifier MR-E series.
Rated output: 2.0kw.
Interface type: general purpose pulse interface.
KH003 special mark for Super MR-E.
High performance and easy to operate, reduce work load.
Enhanced system cost performance.
High performance, high precision positioning (servo motor encoder resolution: 131072) MITSUBISHI HC-MFS053BG1(1/12).
High response.
Suppression of vibration by adaptive vibration suppression control
HC-MFS053BG1(1/12)
Using personal computer and servo setup software to optimize tuning.
Has 2 types of interfaces:
Position control and speed control with pulse train interface.
The analog input interface is used for speed control and torque control MITSUBISHI HC-MFS053BG1(1/12). Max input / output points: 40 points.
Supply voltage: 100 - 240VAC .
Input points: 24 points.
Output points: 16 points.
Output type: relay.
Power consumption (W): 32.
Weight (kg):0.65.
Size (WxHxD) mm:130x90x75.
Rich functionality.
FX series of products are rich in variety, users can be based on cost or application,
Choose the most suitable product MITSUBISHI HC-MFS053BG1(1/12). Will find a suitable model for the user site.
Terminal row type standard machine with extended input output
Can also be less of a system with analog or communication, etc . .
CPU, power supply, input and output integration.
Display module or function expansion board can be less installed.
In addition, you can also reduce the input output or special module.
Built in 8000 step EPROM memory.
No battery. Maintenance free.
Overseas oriented products meet all kinds of international standards. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable -SI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBIISHI PLC program simulaation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram HC-MFS053BG1(1/12) HC-MFS053BG1(1/12).
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
HC-MFS053BG1(1/12) Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-MFS053BG1(1/12)&select=5