SSCNET III connector kitInput type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function: No MITSUBISHI HF-KP23.
Rated load voltage / current: DC24V/0.5A.
External connection: 1 line /1 line type.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup
HF-KP23
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool MITSUBISHI HF-KP23. Protective film for 12.1 inch screen.
Scrub, 5.
Applicable model: GT16. The connector is converted to a spring clip terminal row.Cable length: 0.7m.
For the connection between QnAS/AnSCPU/ motion controller A7GT-CNB (A Series) and CPU.
Applicable models: GT16, GT15, GT11. Fast connector type MITSUBISHI HF-KP23.
Voltage output.
Number of channels: 8 channels.
Occupied the number of stations: Ver . 1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to furtherr carry on tthe on-line unification to adjust HF-KP23.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp bby step HF-KP23.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
HF-KP23 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HF-KP23&select=5