LK Automation Limited
Home >> Products >> MITSUBISHI >> A/QnA series PLC >> Input module / output module >> Input and output hybrid module >> MITSUBISHI A0J2E-E24T MITSUBISHI A0J2E-E24T

MITSUBISHI A0J2E-E24T MITSUBISHI A0J2E-E24T

Brand: MITSUBISHI
Name: Extension module
Model: A0J2E-E24T

RS-232:1, RS-422/485:1.
Transmission speed: 0.3 ~ 19.2kpbs.
Computer connection function.
Printer / peripheral device connection, BASIC language function.
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc..
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps MITSUBISHI A0J2E-E24T A0J2E-E24T
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc MITSUBISHI A0J2E-E24T. .
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram.
So far the system''s hardware electrical circuit has been determined. Fiber optic cable / twisted pair cable.
Single bus.
Control unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program MITSUBISHI A0J2E-E24T.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure MITSUBISHI Extension module. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI Extension module.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc.. Output points: 32 points.
Voltage: DC12/24V MITSUBISHI Extension module.
OFF leakage current: 0.1mA.
Output type: bidirectional thyristor output (type sink).
Response time: 2ms.
32 points / a common end.
50 point terminal station.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requuirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A0J2E-E24T.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation MITSUBISHI A0J2E-E24T.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.


...More relevant models >>>>