Output type: transistor output, drain type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 2 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector A2ACPUR21 Programming Manual.
When installing the module can choose to use the DIN guide rail or screw mounting
A2ACPUR21
3 wire sensor input. Three remote components can be connected to the CC-LINK system.
Remote I/O: refers to the field components that require only ON/OFF control,
Such as digital I/O or pneumatic valve, etc..
In this type of communication can only be carried out in the bit data.
Remote components: the field components that require processing of register data,
For example analog I/O and counter, etc A2ACPUR21 Programming Manual. .
In this type of component, in addition to the bit data can be carried out in the register data communication.
Intelligent remote: this type of element refers to the actions that allow the master station or other station to access,
To collect data and control the local PLC station,
GOTS and programmer interface unit are of this type A2ACPUR21 Programming Manual.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next round of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or adddress number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next rround of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work A2ACPUR21 Manual A2ACPUR21 Manual .