LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A3ACPUR21 PID Control Instructions Programming Manual

MITSUBISHI A3ACPUR21 PID Control Instructions Programming Manual

Product model: A3ACPUR21
Name: PLC
Brand: MITSUBISHI
Sort: PID Control Instructions Programming Manual
File language: English
File size: 3.33MB
External input / output interface unitType of input: DC leakage.
Input points: 8 points.
Input voltage: DC24.
Input current: 7mA.
Output type: transistor drain type.
Output points: 8 points.
Common public end points: 8.
PLC is introduced by the relay control technology after the development of micro processing technology,
Can be easily and reliably used for switching control A3ACPUR21 PID Control Instructions A3ACPUR21
As the analog quantity can be converted into digital quantity, the number of digital quantity is just a number of switching value,
Therefore, after the conversion of analog, PLC can also be reliable for processing control.
Because the continuous production process often has the analog quantity, the analog quantity control is sometimes called process control A3ACPUR21 PID Control Instructions.
Analog quantity is not electricity, and PLC can only handle digital quantity, quantity of electricity.
All to realize the conversion between them to have the sensor, the analog quantity into a number of power.
If this power is not standard, but also through the transmitter,
The non-standard power into a standard electrical signal, such as 1-5V, 4-20mA, 0-10V, etc A3ACPUR21 PID Control Instructions. .
At the same time, there is also an analog input unit (A/D),
Transform these standard electrical signals into digital signals,
The analog output unit (D/A), in order to transform the digital quantity after PLC processing into analog quantity -- standard electric signal.
So the standard telecommunication number, the conversion between the number of operations to use a variety of computing.
This requires the resolution of the analog unit and the standard electrical signal. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable - plastic fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation ddebugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A3ACPUR21 Programming Manual A3ACPUR21 Programming Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
CPU unit
A1NCPUR21
MITSUBISHI CPU unit A1NCPUR21
Input and output points: 256 points. Input /
MITSUBISHI
CPU unit
A2CCPUR21
MITSUBISHI CPU unit A2CCPUR21
Input and output points: 512 points. Input /
MITSUBISHI
CPU unit
A3ACPUP21
MITSUBISHI CPU unit A3ACPUP21
Input and output points: 2048 points. Input /
MITSUBISHI
CPU unit
A3ACPU
MITSUBISHI CPU unit A3ACPU
Input and output points: 2048 points. Input /