LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> PLC A3HCPUR21 Fundamentals Programming Manual MITSUBISHI A3HCPUR21 Manual

PLC A3HCPUR21 Fundamentals Programming Manual MITSUBISHI A3HCPUR21 Manual

Product model: A3HCPUR21
Name: PLC
Brand: MITSUBISHI
Sort: Fundamentals Programming Manual
File language: English
File size: 8.33MB
Cable length: 10 meters.
For QnA/A/FX (FX1, FX2, FX2C) CPU and GOT connection between.
For connection between FA-CNV_CBL and GOT.
For connection between FX-2PIF and GOT.
For connection between FX-422AW0 and GOT.
For serial communication module AJ71QC24 (N) -R4 and GOT connection between.
For connection between AJ65BT-G4-S3 and GOT A3HCPUR21 Programming Manual. I/O slots: 8 slots.
Outline dimension: 430*130 A3HCPUR21
CPU basic board can be plugged into 1 power modules,
1 CPU components and a maximum of 2, 3, 5, or 8 single slot size special function components and I/O components are respectively inserted and arranged.
Expansion ports are arranged on both sides of the base plate,
For connecting the expansion board for.
Up to 3 extension substrates A3HCPUR21 Programming Manual. Number of channels: 4 channels.
Sensing method and temperature range: PT100.
A1S64TC series component is a kind of temperature controller combined with ANS series CPU.
Components with temperature measurement input and built-in PID algorithm control output, can be used in a variety of temperature control occasions.
Each component controls up to 4 loops at most.
Thermocouple input or PT100 3 wire temperature sensor input A3HCPUR21 Programming Manual.
Control output switching signal for the output of the transistor.
BW is a signal with broken line detection function. 3C-2V/5C-2V coaxial cable.
Double circuit.
MELSECNET (II) (remote I/O station) MITSUBISHI A3HCPUR21 Manual .
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI A3HCPUR21 Manual .
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI A3HCPUR21 Manual .
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc.. AnS, QnAS bus connection, the reader to write program 2 channel connection.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the timee of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A3HCPUR21 Programming Manual A3HCPUR21 Fundamentals.
This phenomenon is called the I/O delay time effect.
Related products
MITSUBISHI
Moving CPU unit
A73CPUR21
MITSUBISHI Moving CPU unit A73CPUR21
Multi axis positioning controller. Coaxial da
MITSUBISHI
CPU unit
A2ACPUR21
MITSUBISHI CPU unit A2ACPUR21
Input and output points: 512 points. Input /
MITSUBISHI
CPU unit
A1NCPUR21
MITSUBISHI CPU unit A1NCPUR21
Input and output points: 256 points. Input /
MITSUBISHI
CPU unit
A3ACPUR21
MITSUBISHI CPU unit A3ACPUR21
Input and output points: 2048 points. Input /