LK Automation Limited
Home >> Download >> MITSUBISHI >> Manual Download >> Q2ASHCPU Manual MITSUBISHI Q2ASHCPU PID Control Instructions Programming Manual

Q2ASHCPU Manual MITSUBISHI Q2ASHCPU PID Control Instructions Programming Manual

Product model: Q2ASHCPU
Name: PLC
Brand: MITSUBISHI
Sort: PID Control Instructions Programming Manual
File language: English
File size: 2.84MB
Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 60k.
Basic command processing speed (LD command) S:0.2.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program MITSUBISHI Q2ASHCPU Programming Manual Q2ASHCPU
Output refresh phase: when all instructions are executed,
The output status register is sent to the output latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment MITSUBISHI Q2ASHCPU Programming Manual. "Maximum control axis: 4 axis.
Connection mode with servo amplifier: SSCNET III /H connection type.
The maximum distance between the drive units: 100m.
Operation cycle: 0.88ms.
Interpolation function: linear interpolation (maximum 4 axis), 2 axis arc interpolation.
Color signal: 4 points.
Color detecting set: 4 set.
Even the long distance wiring can be flexible.
The use of fiber optic cable, with high speed, high performance, high reliability of the servo system controller network MITSUBISHI Q2ASHCPU Programming Manual.
In addition to the traditional positioning control, but also to support speed / torque control and synchronous control.
Use simple movement module setup tool",
Can easily perform positioning settings, monitoring and debugging, etc..
In addition, the data can be collected and displayed synchronously with the motion controller.
SSCNET III /H connection to save the wiring, the maximum distance between the station up to 100m,
Absolute position system can be easily supported.
The upper limit limit switch, the lower limit switch and the near point block signal are input by the servo amplifier,
Thus greatly reducing wiring.
In addition to positioning control and speed control, but also to perform synchronization control, cam control, torque control, touch pressure control, etc..
Positioning module (QD75MH) of the project and the sequence of the previous model is highly compatible with the old model,
The project can be easily applied to the simple motion module (QD77MS). "5 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized outpuut mode Q2ASHCPU Manual.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation Q2ASHCPU Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
Related products