Multi axis positioning controller.
Coaxial data communication line function.
Program capacity: Max 60K step.
Input / output points: 1920 points.
PLC commonly used in memory are EPROM, EEPROM and with lithium battery powered RAM.
General micro and small PLC storage capacity is fixed, between 1~2KB.
How much memory is occupied by a user application is related to many factors,
Such as I/O points, control requirements, computing processing, program structure, etc MITSUBISHI AJ35PJ-8R PDF catalog
AJ35PJ-8R .
So it can only be roughly estimated before the program is designed. RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging MITSUBISHI AJ35PJ-8R PDF catalog.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment MITSUBISHI AJ35PJ-8R PDF catalog.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable - plastic optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulattion debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AJ35PJ-8R PDF datasheet AJ35PJ-8R PDF datasheet.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.