CC-link remote device station.
CC-link/LT master function.
Consumption current: 75mA (DC24V, power supply through the power adapter)
Current at startup: 165mA (DC24V, power supply through the power adapter)
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc MITSUBISHI AJ65SBTB1-16D1 PDF catalog. .
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses
AJ65SBTB1-16D1
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc MITSUBISHI AJ65SBTB1-16D1 PDF catalog. ,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system MITSUBISHI AJ65SBTB1-16D1 PDF catalog.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information. DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
4 point /1 a public side.
Positive / negative sharing.
Output points: 4 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
4 point /1 a public side.
Output form: relay.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation ddebugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AJ65SBTB1-16D1 PDF datasheet AJ65SBTB1-16D1 PDF datasheet.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.