Analog input channel number: 8CH.
accuracy
Ambient temperature of 25 plus or minus 5 degrees C: plus or minus 0.1%.
Ambient temperature 0 ~ 55 degrees C: plus or minus 0.3%.
Temperature coefficient.
Common
Conversion speed: 80 s/CH.
Channel to channel insulation.
Absolute maximum input: plus or minus 15V MITSUBISHI .
External wiring connection mode: 18 point screw terminal.
Voltage input
The analog input voltage: DC - 10 - 10V
A1SY40
Digital output value: 32000 ~ 32000.
Current input
Analog input current: -.
Digital output value: -.
16 bit high resolution (1/32000).
No program can perform scaling and conversion operations.
The most suitable for the requirements of speed and accuracy of the detection equipment MITSUBISHI .
Easy to filter high frequency interference.
Execute event driven programs via alarm output.
Through the engineering software, the output of arbitrary analog waveform data.
Reduce downtime and reduce maintenance costs through anomaly detection
Works3 GX can be used to easily set the critical value of the input and output signals MITSUBISHI .
Can quickly detect the abnormal signal, so it can shorten the downtime, reduce maintenance costs .
Channel insulation can ensure the accurate signal transceiver.
Model with " -G " module in the channel between the insulation,
Isolation amplifiers are not required to prevent inter channel current and interference current. Input points: 16 points.
AC input signal type. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V, 0.3A/1 point, 2.4A/1 common end.
Response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
34 point terminal station.
Number of stations: 2 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, and thee timeliness is strong MITSUBISHI A1SY40.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness MITSUBISHI A1SY40.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
A1SY40 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A1SY40&select=5