Cable length: 10m.
Connection between serial communication unit and GOT.
Connection between a computer link unit and a GOT.
Applicable models: GT16, GT15, GT11, HandyGOT, GT10, GT27, GT25, GT23,, GT21. The length of the line: 10M.
IP level: IP65.
Cable outlet direction: the same side of the motor shaft MITSUBISHI .
Bending life: standard.
Encoder with cable (motor side); for HF-KP/HF-MP series (motor shaft with side extraction)
AJ65SBTB2N-8R No introductionSeries Name: A975GOT.
Size: 10 inches.
Resolution: 600 * 480.
Display equipment: high brightness TFT color display.
Display color: 16 color.
Power supply: AC100-240V.
Memory card: 1M.
Man machine interface is the interface between man and machine in the field of information exchange and function contact or influence,
Information exchange, functional contact or mutual influence, the hard contact and soft touch of a person and machine,
This interface includes not only the direct contact point line side,
It also includes the function of remote information transmission and control MITSUBISHI MITSUBISHI .
The man-machine interface is the central link in the man-machine system,
Mainly from the safety engineering branch of the safety ergonomics to study and put forward the basis for the solution,
And over the safety engineering equipment engineering, safety management engineering and safety systems engineering to study the specific solutions and measures to the safety of human computer science and technology .
It realizes the transformation between the internal form of information and the acceptable form of human being. Screw, 2 piece type terminal
Platinum temperature measuring resistor body PT100 temperature input module.
Number of channels: 4 channels.
Number of stations: 4 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiriing diagram and wiring diagram MITSUBISHI AJ65SBTB2N-8R.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesiign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced MITSUBISHI AJ65SBTB2N-8R.
AJ65SBTB2N-8R Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=AJ65SBTB2N-8R&select=5