MITSUBISHI general purpose AC servo amplifier MELSERVO-J2-Super series.
Rated output: 0.2kw.
SSCNET interface.
Voltage: single phase AC100V.
Complete synchronization system with SSCNET high speed serial communication,
The communication cycle between the controller and the servo amplifier is the longest 0 MITSUBISHI A0J2HCPU-DC24. 888ms.
Such systems will be able to provide high reliability and high performance.
When connecting the servo system with SSCNET,
In the motion system, the parameters of the servo amplifier and the acquisition of the data will be displayed on the motion controller
A0J2HCPU-DC24
Connect a dedicated cable with an amplifier and a controller to form a SSCNET system MITSUBISHI A0J2HCPU-DC24.
This simple connection method reduces the routing time and helps to prevent noise .
Even in the MELSERVO-J2-SUPER series products using high resolution coding standards, the command frequency is no limit.
It is only necessary to add a battery on the servo amplifier, which can form the absolute value system.
Currently there are more than 1000000 high reliability SSCNET servo amplifier networks in use MITSUBISHI A0J2HCPU-DC24. Input points: 32 points.
Voltage: AC200 ~ 240V .
Current: 10mA.
Response time: 25ms.
32 points / a common end..
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The coontents of the commponent image register are changed with the change of the execution of the program A0J2HCPU-DC24.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A0J2HCPU-DC24.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
A0J2HCPU-DC24 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A0J2HCPU-DC24&select=5