Analog channel: 16 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/16 channel.
Analog module installation.
Power supply: DC24V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system
AX60
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add MITSUBISHI AX60.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI AX60.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 2.0kw.
Interface type: general pulse interface type.
Power specification: three phase AC200V.
Pulse train and analog input as universal interface.
Can choose the position, speed and torque control mode.
The use of advanced tuning features such as advanced vibration suppression control and adaptive filter,
Greatly improve the performance of the machine.
MR-J3, your partner.
Higher performance, more features, more convenient to use.
Highest performance in the industry.
Speed response frequency up to 2.1kHz. Input points: 16 points.
Voltage: DC5/12/24V.
Current: 5.5/3/6mA.
Response time: 3ms.
8 points / a common end.
Positive / negative sharing.
20 point terminal station.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeeting thee control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC AX60.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation AX60.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
AX60 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=AX60&select=5