Servo motor series: medium inertia, small capacity.
Rated output: 3.5kw.
Rated speed: 2000r/min.
Electromagnetic brake: No.
Power supply: 400V.
Stable driving of medium capacity and medium inertia type products.
Through the optimization of structural design, to achieve the minimum length of the industry MITSUBISHI MR-PWCNS2.
High speed & high torque. Shorten the positioning time, achieve high-speed equipment.
Reducing the electric torque ripple
MR-PWCNS2
Through the combination of the optimal number of the motor and the slot number, the torque ripple is greatly reduced,
To further realize the smooth constant speed device.
Improve the environmental performance of HG-SR, HG-JR series of products using IP67 MITSUBISHI MR-PWCNS2. Oil resistant cap for 10 . 4 inch screen.
Applicable model: GT16. Can be isolated from the output of the programmable controller, the a/b/c contact relay, SSR, Tr output.Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA MITSUBISHI MR-PWCNS2.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup .
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Input and output points: 2048 points.
Input / output data points: 2048 points.
Program capacity: 30K.
Basic command processing speed (LD command) s:1.0.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage cappacity: it is a measure of how much the user application can store the number of indicators MR-PWCNS2.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General lloggical operation instructions each account for 1 words MR-PWCNS2. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
MR-PWCNS2 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=MR-PWCNS2&select=5