Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: AC85V ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system
FR-E740-7.5K-CHT
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add FR-E740-7.5K-CHT.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness FR-E740-7.5K-CHT.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Power: 280kw.
Voltage: 200V.
Sine wave filter.
The voltage and current of the motor can be adjusted to a sine wave.
The sine wave filter is installed to the output terminal of the inverter.
Applicable to FR-A820-03800 (75K) above and FR-A840-02160 (75K) and above frequency converter.
Sine wave filter is equivalent to the operational characteristics of the sine wave power driver, can provide the following benefits.
Low noise.
No surge current.
Reduce motor loss (standard motor). Output type: transistor source / drain type.
Output points: 8 points.
Load voltage: DC5/12/24/48.
Load current: 2A.
Connection mode: terminal row.
Common public end points: 1.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the currennt input combination of the swittch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order MITSUBISHI FR-E740-7.5K-CHT.
So, sometimes also known as the order control.
And seqqueential control is divided into manual, semi-automatic or automatic MITSUBISHI FR-E740-7.5K-CHT.
And the control principle is decentralized, centralized and hybrid control three.
FR-E740-7.5K-CHT Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-E740-7.5K-CHT&select=5