LK Automation Limited
Home >> Products >> MITSUBISHI >> Ans/QnAs series PLC >> MELSECNET/10 module >> A1SJ71LP21 Melsecnet module MITSUBISHI A1SJ71LP21

A1SJ71LP21 Melsecnet module MITSUBISHI A1SJ71LP21

Brand: MITSUBISHI
Name: Melsecnet module
Model: A1SJ71LP21
10Mbps transmission speed, the computer as the support of the flexible manufacturing system at the plant level, the requirements of more and more data flow,
High transmission speed can be guaranteed to increase the amount of transmitted data while maintaining the minimum time to transfer and receive data between programmable controllers.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.

The A1SP60 pulse capture module is a 16 point DC24V input module,
Can be used as a general input module,
Can also be used as a pulse capture module,
Pulse capture function makes the input signal width in the sequence can be as short as 0.5ms,
Once there is a pulse signal input, the state is memory,
A1SP60 to ensure that the control process at least once again to control the state of the memory of the operation,
Input can be set to 4 blocks,
Each block can be set to a general function or pulse capture function MITSUBISHI A1SJ71LP21 A1SJ71LP21 SRAM memory card.
RAM capacity: 256KB. Input and output points: 512 points.
Input / output data points: 8192 points.
Program capacity: 28k.
Basic command processing speed (LD command) S:0 MITSUBISHI A1SJ71LP21. 075.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program.
Output refresh phase: when all instructions are executed,
The output status register is sent to the output latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment MITSUBISHI A1SJ71LP21. AnS, QnAS bus connection, the reader to write program 1 channel connection MITSUBISHI Melsecnet module.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register MITSUBISHI Melsecnet module.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI Melsecnet module.
This phenomenon is called the I/O delay time effect. Temperature sensor: PT100, 4 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and tthe time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI A1SJ71LP21 A1SJ71LP21.
This phenomenon is called the I/O delay time effect.


...More relevant models >>>>