Input and output points: 1024 points.
Input / output data points: 8192 points.
Program capacity: 60k.
Basic command processing speed (LD command) S:0.075.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program MITSUBISHI AS91
AS91
Output refresh phase: when all instructions are executed,
The output status register is sent to the output latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment MITSUBISHI AS91. SRAM+E2PROM memory card.
RAM capacity: 512KB.
E2PROM capacity: 512KB. Output type: transistor drain.
Output points: 16 points.
Load voltage: DC24.
Load current: 2A.
Connection mode: terminal row.
Common public end points: 8.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC MITSUBISHI AS91.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order MITSUBISHI Modular.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic MITSUBISHI Modular.
And the control principle is decentralized, centralized and hybrid control three. Temperature sensor: PT100, 4 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process MITSUBISHI Modular.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLCC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the usse of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI AS91 AS91.
This phenomenon is called the I/O delay time effect.