Description: through the 0~100m infrared space transmission, optical communication status monitoring function.
Station type: take up 1 stations for the remote I/O.
Spare 5 products for different purposes.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure.
Spring clip terminal type relay hub.
Star type wiring, length of the main line, spring clamping terminal table type.
Relay appliance (T branch) unit.
Extension of T type branch and trunk length.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line.
Relay unit in space light.
Communication between linear moving bodies.
Pulse input: differential input.
Preset input: differential input.
Count range: 0~16777215.
Number of stations: 4 stops.
Station type: remote equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration MITSUBISHI AJ65BT-RPI-10B
AJ65BT-RPI-10B
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram MITSUBISHI AJ65BT-RPI-10B.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging MITSUBISHI AJ65BT-RPI-10B.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI Infrared repeater module.
If you do not meet the requirements, the hardware and procedures for adjustment MITSUBISHI Infrared repeater module.
Usually only need to modify the part of the program can be. No introductionOutput type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0 MITSUBISHI Infrared repeater module. 5A.
External connection: 2 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Input type: DC input, positive public end / negative public end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
EExternal connection: 3 wire AJ65BT-RPI-10B.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool MITSUBISHI AJ65BT-RPI-10B.