Cable length: 3 meters.
Long distance CPU extension cable.
For QnA/ACPU/ motion control and GOT connection. Analog channel: 16 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/16 channel.
Analog module installation.
Power supply: DC24V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program A956GOT-SBD-M3-B User's Manual
A956GOT-SBD-M3-B
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add A956GOT-SBD-M3-B User's Manual.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness A956GOT-SBD-M3-B User's Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. DC input points: 2 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
2 point /1 a public side.
Positive / negative sharing.
Output points: 2 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 4A/1 common end.
Output response time: 2ms.
2 point /1 a public side.
Output form: relay.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulattion debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A956GOT-SBD-M3-B Manual A956GOT-SBD-M3-B Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.