Protective film for 15 inch screen.
Transparent, 5.
Applicable model: GT16. Cable flat cable;
Connector with 20 pin installed at both ends of the fuse.
Length 1.5M. Screw, 2 piece type terminal.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 2 stops.
Station type: remote equipment station MITSUBISHI MR-J2CN3TM.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control
MR-J2CN3TM
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps MITSUBISHI MR-J2CN3TM.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication . Output points: 64 points.
Voltage: DC12/24V.
OFF leakage current: 0.1mA.
Output type: transistor output (type sink).
Response time: 2ms.
32 points / a common end.
40 pin connector.
With circuit breaker protection function.
With the surge absorber MITSUBISHI MR-J2CN3TM.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh .
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeeting the contrrol requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC MR-J2CN3TM.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation MR-J2CN3TM.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
MR-J2CN3TM Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=MR-J2CN3TM&select=5